It applies to large-current DC power supply in the smelting industry used as power supply for  melting and refining copper.

If you have any specific demands,please tell us the parameters in details. We’ll be more than happy to work with you to meet your exact requirements.

The main parameters of our Thyristor / Diode High Current Rectifiers for Industrial Applications:

A)Voltage Specification:  5V - 3000V

B)  Current Specification:  300A - 240000A

C)  Output Current Adjusting Range: 0 - 1000A


Model KHS-18000A40V Rectifier Unit  for Copper SmeltingTechnical Performance Guarantee

Series

Name

Parameter

Remark

1

Input

AC380V-400V, 3 phase,frequency:50Hz

Recommend

10KV

2

Ambient Temperature

-5° - 45°


4

Output DC IdN

0-18000A

Continuously adjustable

5

Output DC UdN

0-40V

Continuously adjustable

6

regulated current accuracy

±0.5%


7

Power factor

>0.86


8

Mode of connection

double reverse star 6 pulse wave


9

Control method

Constant current,

Local control/ remote control

switching control

10

Control function

PLC+HMI

communicate with pc

11

Cooling mode

water/water


12

Protection function

Over-current protection,Over-voltage protection,

Element damage Alarm,Over-temperature protection,

Cooler fault alarm


13

Record

voltage AC, voltage DC, current DC, power DC,

control angle, transformer oil temperature


14

Allow overload capacity

130% IdN   1 min

Within 24 hours

15

Noise

≤60dB

ahead 1m

16

Remote communication way

RS485


Digest of High Current Rectifier(HCR)technical documents.

Part four of  L SS— Series Pure water cooling device

 

Ⅴ、Application

1、 Fabricate a concrete foundation according to the drawing. There should be a weep hole or a drainage passage to discharge the effluent during shakedown test or repair. Tap water should be drawn into room and a 1/2” valve and water trough should be installed.

2、 Mount the device on the prefabricated concrete foundation.

3、 Position of the elevated water vessel OS to be determined by the user. The vessel may be mounted on the frame of against the wall. It should be a bit higher than rectifying cabinet. Φ19 laminated rubber pipe of rated pressure of 0.5 Mpa (GB1187-74) is to be used for connection with the device.

4、 Install the connection pipelines for the primary and auxiliary equipment. The pipelines

 

should be made of either stainless steel or engineering plastics and cleaned before installation. The inlet and the outlet for pure water have been fitted each with a stainless steel flange union when delivered. Stainless steel pipes of the same diameter as that of the union are to be welded on the union. Install all the external pipes for secondary cooling water, test for pressure and tightness.

5、 If the heat exchangers are in slack condition when delivered, it is necessary to adjust them

 

tight before put into operation. For this purpose, loose the flanges for adjusting the tightness of the plates, screw tight the lead screws of exchangers from centre to bottom ends gradually. (Be sure to tighten the lead screws multiple times so as not to damage 

the plates. The peripheral heights should be equal. ) Tighten the adjusting flanges again. The dimension of the plates after having been tightened is 210mm (not including thickness of the upper and lower plates). If the plates have reached this dimension when delivered, they neednt be tightened.

6、 Open the electrical control box. Connect the four power input lines L1、L2、L3 and N 

according to the position of the terminals. Connect the ground joint properly.

7、 Type conversion of new ion exchange resins having no exchange ability due to neutral exchange groups, the newly purchased anion and action exchange resins must be treated to change their type. For the process of type conversion, please peat relevant books. Usually the type conversion operation is to be carried out with the help of persons from our plant. Here is only a brief recount of the process.

For  strong  a  cid  732  action  exchange  resin:  washing soaking  in  10%NaC1  marinate washing dynamic or static treating in 6% HCl washing to PH=5.

For strong base 717 anion exchange resin: washing soaking in 10% NaCl washing Dynamic or static treating in 4% marinate washing to PH=9. continue to run a few minutes, stop running, twist open drainage valve of low punch expansion water tank to discharge water by hose; if discharged water is dirty, boot should be repeated several times for cleanout. Re-fill water tank with pure water near full, and continue to boot to render air of our cooling system charged. When level of low punch expansion water tank declines, pure water should be added.

8、 Washing  and  trial  running:  Close  the  inlet  and  the  outlet  valves  V21and  V22of  the  ion exchangers and open all other valves of the pure water loop.Remove the gland of the expansion valve on the top of the water vessel. Open the hose V22 to let the clean tap water flow into the device. When the water has reached the upper part of the level cabinet of the water&nb

Total0bar [View All]  Related Comments
 
More>other products

[ ProductsSearch ]  [ Send Fav ]  [ Share ]  [ Print ]  [ Send Report ]  [ Close ]

 
Home | Products | Suppliers | News | Tradeshow | Sitemap | Message | RSS Feed